x Need help? We're here for you.

Call +1 408 419 0462
Email Us

Success Stories

  • umass
    UMASS – UNIVERSITY OF MASSACHUSETTS MEDICAL SCHOOL, USA

    The Project: Size: Extend the UMass Medical HPC InfiniBand fabric, post re-cabling projects we did in the last couple of engagements. Primary SI: DELL The Challenges: The UMASS admins were getting a lot of criticism from their customer base. The cluster was slow and unreliable. One of the key professor and researchers was very critical

    READ MORE
  • insa
    INSA – ADDIS ABABA, ETHIOPIA

    The Project: Bringing up OpenStack environment, using our advanced SRIOV feature and Ceph storage to achieve max performance The Challenges: Private cloud solution based on OpenStack Advance Ethernet network Software-defined storage based on Ceph Complete rack solution Compute and Storage scalable Off the shelf building blocks The Solution: Deployment servers: Deployment servers used for solution deployment,

    READ MORE
  • tencent
    TENCENT – SHANWEI, CHINA

      The Project: Size: Physical Network includes a full fat tree, non-blocking, 2 tier network with 32 LEAFs and 16 SPINEs Primary SI: IBM The Challenges: Aggressive schedule High network demands New servers On-site presence was required during the entire period of the project, including close by engineers during the weekends The Solution: The Physical

    READ MORE
  • tech-electronics
    TECH ELECTRONICS – MISSOURI, USA

      The Project Mellanox Services was engaged in remotely preparing and assisting with the installation of new Mellanox equipment. The goal was to bring up two SN2700 switches to replace existing core switches (Cisco Nexus). The configuration contained 3rd party equipment and a variety of Ethernet protocols and services. The Challenges: Being the core switches on an

    READ MORE
  • sears
    SEARS – ILLINOIS, USA

      The Project: Size: Expansion from 36 nodes to 108 nodes Primary SI: DELL The Challenges: Sears generally uses their cluster for Ad-Hoc projects and to a lesser extent, for Sears Data Scientists. Expansion of Sears current environment from 36 nodes to 108 nodes Converting FDRnon –blocking 1:1 IB network, to a 2:1 blocking IB network

    READ MORE
  • GE Logo
    REDUCE POST PRODUCTION RISK – GE, INDIA

      The Project: Size: 800-node, mixed cluster Primary SI: HP The Challenges: 10 different fabrics needed to become one Mix fabric speeds, DDR/QDR/FDR Fabric’s health is known to be unstable Firmware/ software compatibility at such size The Solution: PS worked closely with R&D to mimic such a cluster PS conductedpre project health check for all fabrics

    READ MORE
  • DOW Jones
    BT/DOW JONES – NEW JERSEY, USA

      The Project: Size: 50 nodes InfiniBand with Gateway The Challenges: Extremely complicated cluster HA needs Multicast Ethernet connectivity redundancy Security restrictions consideration blocking OOB solution configuration Lacking partner experience in similar scenarios The solution: An end-to-end solution including deployment and training for the customer and partners GPS conducted lab tests; simulation to certify a workaround

    READ MORE
  • ASTAR Logo
    FLEXIBILITY AND AVAILABILITY – ASTAR, SINGAPORE

      The Project: Size: 1500-node EDR Primary SI: Fujitsu The Challenges: Lack of Fujitsu’s experience Constantly changing target schedule End 2 END large EDR cluster New Fujitsu server integration Aggressive schedule (data center is under construction) Multi-vendor environment – DDN, CISCO, LANTROVISON, PROMETRIX, FUJITSU The Solution: Mellanox TAM, deployment services, Mellanox Care Ground zero bring up

    READ MORE
  • Julich logo.gif
    NEW TECHNOLOGY EXTREME TIME TO MARKET- JURECA, JULICH GERMANY

      The Project: Size: 1800 nodes EDR Primary SI: T-Platform The Challenges: First time ever T-Platform integration with Mellanox EDR products FIRST EVER Barracuda installation with a moving GA targets On time deployment 4x BARACODA, 1500 cables under floor layout, 107 xSB7790 T-Platform built and connected 5 cabinets in 3 months’ time frame The Solution:

    READ MORE
  • Lenovo-new-logo-2015
    LENOVO BENCHMARK CENTER – STUTTGART, GERMANY

    New Partner Area Post New Partner Area Post New Partner Area Post New Partner Area Post New Partner Area Post New Partner Area Post New Partner Area Post New Partner Area Post New Partner Area Post New Partner Area Post New Partner Area Post New Partner Area Post

    READ MORE

Mellanox Cookie Policy

This website uses cookies which may help to deliver content tailored to your preferences and interests, provide you with a better browsing experience, and to analyze our traffic. You may delete and/or block out cookies from this site, but it may affect how the site operates. Further information can be found in our Privacy Policy.